Emergency Services – Far West NSW

Project Overview

The District Services Officer at an Emergency Services department in far west NSW approached Storeplan with a question in March 2014:

Could we provide them with a system to maximise storage space in their existing building as well as provide them with a secure storage option for PPE gear & communication devices?

The answer…Yes!

The first site visit was completed early in April by two team members to formerly introduce the company & assess what products & services we could provide to solve this problem.  We took the details back to our design team and a solution was found…We would build a structural mezzanine floor over the existing office block & use LS600 Longspan Shelving with rodent proof Plastic Tubs for the PPE gear, & Lockable Steel Cupboards for the communication devices.

Project Specifications:
  • 67m2 Additional Floor Space achieved
  • 2Kpa – 200kg capacity per metre2
  • Heavy duty 22mm particleboard used for floor base
  • Stairway & handrail included
  • Sliding pallet gate
  • Supported by existing steel shed columns with additional structural posts supplied by Storeplan
  • Design, Supply & Installation service provided with minimum interruption
  • Plastic Tubs with lids to provide rodent proof storage for PPE Gear