Narrabri Coal Mine

RUT shelving – Situated on top of the Longspan supported Mezzanine floor, this shelving system was used for small to medium parts and miscellaneous items. This system has shelf capacities of up to 100kg per shelf. Longspan supported mezzanine – The mezzanine was installed to increased storage space utilise spare air space. It was fitted

Seedforce

Seed Force Pty LTD is part of a world leading seed group. It is recognised as the Australia leader in bringing the best genetics to the market along with technologies that optimise farm productivity and profitability. Product Overview: Storeplan upholds it’s ‘Get It Right’ guarantee once again. The installation multiple bays of Schaefer pallet racking

Food Retailer

Project Overview: Organised. Fresh. We have just completed another successful installation of the Gondola Display Shelving! Mark called on us as he needed someone with efficient and reliable service to assist him with his store shelving and storage. This was a new business oppotunity and Storeplan was ready to help him out. By listening to

TLE Electrical – Armidale

Project Overview: After supplying and delivering TLE Arimdale with 40 bays of Super 123 and 6 bays of Longspan shelving for their warehouse – they called us back 2 years later, to solve yet another, of their storage needs! This time it was to supply, deliver and install a Structural Steel Mezzanine Floor/Raised Storage Platform. This system features a

Six Hills Group

Project overview: This job involved the setting up of an office for Six Hills Group. They needed a compact storage solution for their files, so we provided them with an ideal 9 bay Storeplan Mobile Shelving System, also known as  the compactus unit. This system gave them a total of 56.7 lineal metres of organised

McGregor Gourlay

Project Overview Supplied, delivered  & installed by Storeplan, the 1600 selective pallet racking (galvanised frames and orange beams) was ready to go in only four days! The Storeplan installation team worked in with the rural store staff to ensure very little disruption to existing operations. –          254 pallet spaces on beams –          82 pallet spaces on

Tamworth City Prestige & Toyota

Project Overview:- Design, Supply, Delivery & Installation fo 67 Bays RUT Steel Shelving in the Parts Store & Repairs/Tools Store of Tamworth City Prestige. All bays were ‘open’ style with cross-bracing straps used instead of back panel sheets. The system provided a UDL of 100kg/shelf & a maximum bay load of 500kg. All shelving was

Clinton’s Toyota

Project Overview: ……. Get a quote

Tamworth Tile House

Project Details:- This project involved the Design, Supply, Delivery & Installation of Twenty-eight (28) bays Schaefer I600 Pallet Racking – two runs of 6 bays, two runs of 4 back-to-back bays. All bays are 2600mm x 6050mm high x 838mm deep with 3 adjustable beam levels per bay. Beams are 2600mm with load capacity of 1500kg per

Lismore Base Hospital

Project Details (Part 1): Storeplan has recently completed the fitout of over 25 rooms at the new Lismore Base Hospital Emergency Department & Renal Unit. With a large variety of products from both our standard range & custom made items; we made the facility a neat & tidy workspace. Products Included: Mesh-Pak Bins Wire Shelving

John Hunter Hospital NICU

Project Details: From Initial contact with John Hunter Hospital, it took the Storeplan team 10 days to complete this project. The project involved fitting out existing cupboards at the new Neonatal Intensive Care Unit with extra timber melamine ‘packers’ to make internal dimensions exactly right for our Hammerlit High Density System. There was a total

Snooze – Tamworth

Project Details:- This project involved Design, Supply, Delivery & Installation of an I600 Pallet Racking supported mezzanine floor (Raised Storage Platform). The floor has a Capacity of 3kpa (300kg/square metre) with a total area of over 50sqm. Accessories Included: Full access stairway with handrailing on both sides. Hand railing on all edges. Sliding pallet gate
TOP